
26
2B. Ceiling Mount Preparation
Once the throw distance has been calculated and the screen installed, the
next step in the installation is to locate the precise mounting position of the
projector.
The ceiling mount bracket must be aligned to the middle of the screen and
located as close as possible to an electrical source AND a support beam. If
the projector is not located properly, it is not possible to compensate for any
resulting “keystone” distortion in the projected image.
IMPORTANT NOTES:
1. Before proceeding further with the installation, make certain that video signal/
control wiring and AC power have been run to the projector location. Keep
in mind that the connections to the projector are at the front left side of the
unit, looking from the front of the projector. Place the signal and AC power
cables slightly to the front and left side of the center of the projector.
2. In rooms where the projector is mounted near a rear wall, be sure to allow
adequate clearance for proper ventilation. Allow at least 12” of rear-facing
clearance. (See Figure 2). Improper ventilation is a cause the TransVision
projector to overheat, shortening lamp life and reducing the reliability of
electronic components. Projector failures due to overheating will invalidate
the manufacturer’s warranty.
3. When the unit is mounted inside a cabinet, be certain that an exhaust vent is
provided so that the hot air generated by the projector may be safely removed
from the cabinet. DO NOT RECIRCULATE AIR FROM WITHIN THE CABINET.
Failure to properly design an enclosure will cause projector overheating,
resulting in premature lamp failure and wear of electronic components. See
Figure 3
Mounting Close to the Back Wall
CEILING
EXHAUST
BACK WA
LL
12” MIN
INTAKE
Figure 2
Enclosed Ceiling Mount
INTAKE
ENCLOSURE
EXHAUST
FA
NS
Figure 3
Kommentare zu diesen Handbüchern